IBS Institute for Basic Science
Search

[85596호]크라이오 펌프/Cryopump System

equipment explanation
Model CTI onboard cryopump
Operating time 01:00 ~ 24:00
inquiry 김정균.lostspirits@navercom
Reservation

1. Rough Pump connection : NW 25 ISO KF
2. Purge Gas Connection : VCR-4 Female Nut
3. Integrated HardwareRoughing, Valve Purge Valve, Cryopump TC gauge, 1st stage diode, 2nd stage diode, 1st stage heater, 2nd stage heater, 2 set point relays, RS-232 Interface
4. Pumping Speeds : Water = 2500liters/sec, Air 800 = liters/sec, Hydrogen = 1200 liters/sec, Argon =   650 liters/sec
5. Argon Throughput : 700 sccm (9 Torr-liters/sec)
6. Capacity:Argon = 500 std. litersHydrogen = 9 std. liters @ 5 x 10-6 Torr
7. Crossover : 100 Torr-liters
8. Regeneration timeFull (Typical) Less than 162 minutesFast (Typical) Less than 60 minutes

 

※ 공동활용에 문제가 있으면, 장비심의관리위원장 또는 행정실로 연락주시기 바랍니다.